2011年11月30日星期三

The Golden Curse of the Peruvian Amazon

Madre de Dios, the name of a region in southeastern Peru bordering Brazil and Bolivia, is a very common designation for the Virgin Mary, meaning Mother of God in Spanish. In real life, however, Mother of God, used as an oath and not a name, expresses what intense and unregulated gold exploration and extraction are doing to this up-to-now privileged area in Peru.

Madre de Dios is a region rich in cotton, coffee, sugarcane, cacao, Brazil nuts, and palm oil. However, plentiful gold has attracted tens of thousands of illegal miners whose activities are having a deleterious effect not only on precious species in the environment but also on the health and quality of life of both native and new populations in the region.

Alluvial gold mining in Peru’s Amazon rainforest has rapidly spread in recent years, driven by the high price of gold. Although many jungle-mining concessions have been granted by the energy and mines ministry, the informal sector has grown out of control.

It is estimated that almost a quarter of the gold produced in Peru, the world’s sixth largest producer, is illegal. The majority of this illegal gold comes from the Madre de Dios region. Local nongovernmental organizations believe that there are up to 30,000 miners in the area.

Gold deposits are mined by both large-scale operators and small-scale miners who use hydraulic mining techniques and heavy machinery to expose potential gold-yielding gravel deposits. Gold is extracted by a sluice box, a piece of gold prospecting equipment that has been in continuous use for over a hundred years. The sluice box is used to separate heavier sediment and mercury is also used for amalgamating the precious metal.Several studies have shown that small-scale miners are less efficient in their use of mercury than industrial miners. As a result, 2.91 pounds of mercury are released into waterways for every 2.2 pounds of gold produced. It is estimated that more than 40 tons of mercury have been absorbed into the rivers of Madre de Dios, poisoning the food chain.

Mercury not only contaminates waterways and becomes a serious threat to human health but is also a dangerous toxin to fish. Fish in the area contain three times more mercury than the safe levels permitted by the World Health Organization.

According to the World Wildlife Fund, “After fossil fuel burning, small-scale gold mining is the world’s second largest source of mercury pollution, contributing around one-third of the world’s mercury pollution.”

Mercury contamination is not the only drawback of small-scale mining, however. Another significant problem is the significant amount of deforestation it produces while clearing forests for the construction of roads to open remote areas to transient settlers and land speculators.

In addition, deforestation is the result of cutting trees to obtain building material and fuel wood.

The enormity of the damage has been documented in a study by American, French, and Peruvian researchers published in the peer-reviewed magazine PLoS ONE. According to the study, Using satellite imagery from NASA, researchers were able to assess the loss of 7,000 hectares (15,200 acres) of forest due to artisanal gold mining in Peru between 2003 and 2009. This is an area larger than Bermuda.

Jennifer Swenson, the lead author of the study, says that such enormous deforestation is “plainly visible from space,” and suggests that Peru should limit the importation of mercury.

In addition to these problems, illegal gold mining has significantly increased the number of 12-to-17-year-old girls and young women drafted by prostitution rings. These young women are brought from all over the country to brothels that have sprung up in mining camps. Many of the women that fall into these prostitution rings eventually disappear, and are never seen again. Miners also bring diseases to local indigenous populations.

While Peruvian authorities have sent almost 1,000 security forces to destroy river dredgers used by illegal gold miners in the Madre de Dios region even more drastic measures are needed, such as stricter vigilance and regulation. At stake is the survival of what has been recognized as one of the most biologically rich areas in the world.

2011年11月29日星期二

Blastcrete Equipment introduce new mine mate machine

Blastcrete Equipment has introduced the Mine Mate, designed to mix and pump concrete material for underground mine sealing and stabilisation, grouting and various other shotcrete applications. The Mine Mate is a convenient solution when ready-mix concrete is not an option. Featuring Blastcrete’s X-10 ultra-high pressure swing tube pump, it is a highly productive and reliable machine that’s also easy to operate and maintain.

The Mine Mate uses the wet-mix shotcrete process. It was created at the request of several customers seeking a machine to apply shotcrete in underground coal applications. In contrast to the dry shotcrete (gunite), the wet shotcrete process minimises dust emissions and improves visibility making it much safer, particularly for underground use. Of compact configuration, the Mine Mate is designed for operation within a 1.2 m ceiling.

The Mine Mate includes Blastcrete’s X-10 76-mm, high-pressure swing tube pump, and a high shear continuous mixer. The unit is capable of mixing and pumping 9.2 m3/h and can handle aggregate up to 9.5 mm diameter. It can pump material in excess of 150 m, horizontally and vertically. Additionally, the hydraulic pump can run in reverse to eliminate line pressure from the delivery line should a hose plug.

The X-10 provides easy access for cleaning and maintenance. The receiving hopper of the pump is mounted with a heavy-duty hinge so that it can easily swing away from the swing tube section. The flat pack is held in place by four heavy-duty bolts so that the spare flat pack can quickly and easily be replaced.

Available power options include a V3,600, 50-kW Kubota water-cooled diesel engine or 37-kW electric motor with starter and disconnect. The machine can also be equipped with a material screw conveyor, with bin indicator for charging the continuous mixer. The Mine Mate’s X-10 is CE Certified, meeting European Union safety standards for equipment operation.

2011年11月28日星期一

Eaton Announces Breakthrough in Hydraulic Hose Technology

Diversified industrial manufacturer Eaton Corporation today announced the launch of a new breakthrough technology that enables reporting of imminent hose assembly failure by means of real-time monitoring of high pressure hose assemblies used in hydraulic systems.

Eaton's LifeSense(TM) hose, a patented hydraulic hose condition monitoring system, will be introduced to the North American market at the International Fluid Power Exposition (held in conjunction with ConExpo 2011) in Las Vegas, March 22 - 26, and to the European market at Hannover Messe 2011 in Hannover, Germany, April 4 - 8.

Eaton's LifeSense hose was developed in conjunction with Purdue University and the Purdue Research Foundation's Office of Technology Commercialization to continuously monitor the health of hydraulic hose assemblies and alert users when an assembly approaches the end of its useful life. The LifeSense hose can monitor and track the health of each hose assembly in a hydraulic system. This system does not estimate or predict through arithmetic calculations when a hose is going to fail, like some products on the market today. The LifeSense hose actually detects when a hose is nearing the end of its useful life. Then an alert is sent to the user so that the assembly can be replaced to prevent downtime. A single monitoring unit can handle input from multiple hose assemblies.

"Most hydraulic maintenance programs are designed to avoid hose failures by replacing assemblies at regular intervals, using a schedule based on usage data or past experience," said Doug Jahnke, Eaton product marketing manager. "As a result, a large number of perfectly good hydraulic hose assemblies are discarded long before the end of their useful life out of fear that they might fail."

The LifeSense hose allows the user to utilize virtually all of the useful life of a hydraulic hose assembly, more than 50 percent longer life in a typical lab test, thus saving on replacement costs and associated downtime while providing peace-of-mind that productivity will not be impeded and safety not compromised by unpredicted hose failure.

"Additionally, hydraulic hose failure is one of the largest causes of unplanned maintenance events," Jahnke said. "Hose failures in the field present serious safety issues, environmental concerns and result in unscheduled system downtime, all of which have serious economic impacts."

The initial LifeSense hose offering will include the widely-used -8, -12 and -16 two-wire hose assemblies. Eaton's LifeSense hydraulic hose condition monitoring offers performance equal to industry standard 2SN pressure-rated hose and is certified to the same industry specifications as conventional hydraulic hose products. The technology is currently available for trial with factory-made assemblies including straight JIC swivel fittings.

Eaton's Hydraulics Group is a segment of the company's Industrial Sector. The business is a worldwide leader in the design, manufacture and marketing of a comprehensive line of reliable, high-efficiency hydraulic systems and components for use in mobile and stationary applications. Mobile and stationary markets include agriculture, alternative energy, construction, forestry, manufacturing, material handling, mining, oil and gas, processing, transportation and utility equipment.

Eaton Corporation is a diversified power management company with 2010 sales of $13.7 billion. Celebrating its 100th anniversary in 2011, Eaton is a global technology leader in electrical components and systems for power quality, distribution and control; hydraulics components, systems and services for industrial and mobile equipment; aerospace fuel, hydraulics and pneumatic systems for commercial and military use; and truck and automotive drivetrain and powertrain systems for performance, fuel economy and safety.

2011年11月27日星期日

Equipment, training upgrades aid in prompt patient removal

Imagine traveling in a vehicle and are suddenly involved in a head-on collision. One is disoriented and scared, and are trapped in the vehicle.

On Nov. 8 this scary scenario did occur on Route 17 in Hope. Emergency units were dispatched to the scene. One of the responding agencies was the Camden First Aid Association Access Team.

The CFAA Access Team is a group of volunteers whose mission at the scene is to “open up” a vehicle, or vehicles, providing EMS personnel space to work and remove injured persons. They use hydraulic tools (Jaws of Life), electric tools, hand tools, and air bags to perform this task.

A recent upgrade to the Jaws tools, as well as members commitment to training and education, permitted a quick patient removal from one of the vehicles at the Route 17 accident.

The equipment upgrade included: mounting a hydraulic pump in a cabinet readily accessible from outside the truck, three reels mounted in the rear of the vehicle connected to the hydraulic pump (three different colored hoses), hydraulic tools mounted near the reels providing quick connection and deployment (grab-and-go capabilities), quick connection couplings on the hydraulic hoses and tools which provide prompt initial setup as well as swapping tools. There is also a portable hydraulic pump and 30-foot lengths of hydraulic hose set up to be portable. A generator provides power for on-scene lighting and two reciprocating saws.

Training commitments included an all-day academy where members were educated on safety, response, scene control, cooperation with other agencies, and concluded with an afternoon of learning and practicing prying and cutting techniques using donated vehicles. Monthly drill sessions included “opening” vehicles, equipment familiarization, driver training, and locked vehicle entry.

Standard Operating Procedures and Policies are being reviewed and updated, and will be distributed to team members providing guidance, and ensuring consistent delivery of extrication operations.

Member commitment to training, education, team work, and use of the upgraded tools has resulted in efficient operations on scene.

The CFAA Access Team asks drivers to be careful as they travel, and assure drivers they will be there should the need arise.

2011年11月24日星期四

The durable braid reinforced PC hose

Nylobrade, the reliable braid reinforced PC hose, was released in the direction of the U.S. in 1956 by Raymond Baker, founder of NewAge Industries, Inc. the organization is proud to recognize the 55th anniersary with this remarkable and durable product this month.

Baker, an businessman who began his indiidual metal hardness screening deices business, arried throughout a brand brand new sort of hose een although on the trip to England. He felt the product experienced marketing possible een although in the United States, howeer it didn抰 suit the hardness tester business. Baker began a brand brand new diision with this reolutionary product that he named Nylobrade.

For decades Nylobrade has long been employed for liquid, air, and gasoline moe in apps inoling chemicals, dinners and beerages, OEM, toys, pneumatics, minimal stress hydraulics, MRO, pools and spas, health care deices, fuels and oils, and instrumentation. it could be used as protectie jacketing.

Nylobrade recently gained NSF (National Sanitation Foundation) official certifications for potable consuming water (NSF 61) and dinners deices (NSF 51), permitting its use in these closely and ery carefully regulated applications.

Originally made with nylon braid reinforcement, these times Nylobrade is produced een although in the U.S. from polyester braid product and crystal-clear PC (polyinyl chloride) thermoplastic. The inside in the hose is extruded first, then wrapped with braid. An external layer of PC is extruded to encase the braid and type the finished hose. All Nylobrade components are non-toxic and conform to FDA and USP (United suggest Pharmacopoeia) school I standards. The hose also complies using the RoHS directie.

Nylobrade is stocked in sizes ranging from 1/8 to 2 I.D. and arries in three wall thicknesses  thin, standard, and increased pressure. NewAge also shares a broad range of fittings and clamps to mate with Nylobrade.

In company offered that 1954, NewAge sectors manufactures and fabricates thermoplastic and thermoset tubing in equally reinforced and unreinforced styles. the organization proides an all round product high quality rating of 99.7%, offers extensive customized extrusion and fabrication capabilities, and companies possible customers worldwide. NewAge sectors maintains a tremendous stock options and prides by itself on same-day shipment of 99% of orders for its major product lines. In 2006, NewAge initiated an ESOP (Employee stock options Ownership Plan) to the benefit of equally its employees and customers.

2011年11月23日星期三

Couple Thankful for Wedding Ring Rescue, Men Behind It

Like most of us when asked what we are most thankful for each Thanksgiving season, things like family, friends and good health top our lists. But this year, Tina and Bernie Fornadley of Niguel Shores in Dana Point have added some interesting acquaintances to their list—a crew from the South Coast Water District.

Just how did SCWD’s collection systems supervisor Ernie Garcia, system operator Justin Davis, senior operations and maintenance technician Artie Garcia and closed circuit TV operator Jimmy Gomez land on the Fornadley’s Thanksgiving list? It all started on an early morning in September when Tina woke to find her precious diamond engagement ring missing from her finger.

After hours of frantic searching, Tina’s husband Bernie asked, “Are you sure you didn’t flush it?”

Tina paused and thought back to the early morning hours and remembered getting up to use the bathroom at about 5 a.m. She recalled that during the night she had moved her ring to her pinky finger because it was bugging her.

“I never take my ring off but it felt itchy that night so I moved it to another finger. I realized that it must have slipped off when I got up to use the restroom.”

So by the process of elimination—and funnily enough, during the process of another kind of elimination—the Fornadleys realized the ring had most likely gone down the toilet.

By the time they came to this conclusion, it was 9 a.m. and in the four hours that had passed, the ring could be long gone.

Bernie tried, to no avail, vacuuming the toilet drain with a shop vac, hoping that by some miracle the ring had not made it to the main drain.

The couple has been married since August of 2000 and that ring—nearly 4 carats in weight—was the ring Bernie presented to Tina when he proposed.

Both were terribly distraught, Tina even more so after calling the water district to inquire whether they would have any recommendations to offer.

“At first they said there was nothing we could do,” said Tina. “I was so upset.”

With panic and the obvious sound of desperation in her voice as Tina tried desperately to hold back tears, the SCWD customer service representative on the other end of the line told Tina she would refer the problem to Ernie.

Ernie promptly called back to tell the Fornadleys he would be sending a crew shortly.

“My first thought when I heard Tina’s story was that their home is in a low flow area so if it did go into the main line there would be a chance to catch it,” said Ernie. “I told them not to use the sinks, showers or toilets and we would do our best.”

Justin installed a debris trap—a screen inside the 8-inch diameter pipe where it flows into at a manhole downstream—to hopefully catch any heavy debris. He also brought a hydraulic line cleaner along to try to flush the ring into the trap.

“I was confident that if it was in there we’d catch it,” said Justin. “I put two traps in just to be sure.”

After that Artie, Jimmy and Ernie put a video camera inside the main line and ran the camera 176 feet down the line but couldn’t see the ring on the video monitor. Justin also cleaned the line from downstream up a couple times that day.

Despite their efforts, the crew had no luck locating the ring and they packed up their truck and left.

“We had the cleanest line in Dana Point,” said Bernie, “but we still had no ring.”

Ernie suggested that Bernie call a plumber to video the line from the house. After about the third call Bernie placed, he got someone to respond. Bernie pulled the toilet off its mount in preparation for the plumber’s arrival.

The plumber told the couple that he checked the private line between the house and the main line and gave them a grave explanation—or according to Bernie, more of a sales pitch—saying the ring was most likely there but their line was clogged and had root blockage.

“The plumber had us thinking that to get the ring back the line would have had to be dug up and completely replaced, to the tune of thousands of dollars,” Bernie said. “He had us thinking that the expense to get the ring may not be worth it and he also put my wife in a panic, fearful that the pipes were busting and full of roots and our house was in jeopardy of a future flood. Incidentally, our private lines turned out to be just fine.”

Still heartbroken, Bernie reached out to Ernie once again.

Ernie was with his boss Joe McDivitt when Bernie’s call came in. Joe encouraged Ernie to go back for another try.

The next day the SCWD crew returned and replaced the debris trap for another go at it and repeated the same procedures—again to no avail.

“Next we brought a portable camera, ran it down the toilet drain and didn’t see the ring after quite a few attempts,” said Ernie. “We were just about to tell Bernie that there was no hope. Then in a last ditch effort we finally spotted it on camera and began trying to flush it down the line with a high pressure, 1000-psi jetter hose. The ring still wouldn’t come out but the sight of it gave us our second wind.”

The crew went in through another sewer line access point with a portable jetter. It didn’t work. They tried flushing all the toilets in the house at the same time and turned on all the faucets at once. The ring still wouldn’t budge.

They kept trying and watched on camera as the ring started to be nudged along slowly by the water pressure and the movement of the camera.

“Once the ring was pushed into the main drain, we thought we stood a good chance of retrieving it,” said Ernie. “When we first videoed the main, once again we couldn’t see the ring but we kept flushing the line.”

Justin, who was waiting down at the manhole cover on the street, saw a pile of foam accumulating in his debris trap, but no ring. Someone on the street was doing laundry and soap suds were coming through the main line, he said.

“As soon as we shut off the water pressure to the basket and the water calmed, I looked in and there it was,” said Justin.

Cheers rang out and high fives were exchanged all around.

Artie said that in his 27 years with SCWD he had taken a couple of similar calls, but this was the first time he’d actually found a ring.

2011年11月22日星期二

New services in pumping

There has been a flood of activity in the site dewatering and slurry pumps sectors both in terms of new products and the structure of the industry, which should have a positive impact for contractors.
One development has been the establishment of a new company - Xylem, which was launched as a spin-off of the water-related businesses of ITT Corporation. 

Xylem comprises Godwin surface-mounted and Flygt submersible pumps for sale and rent, and it has also launched a new range of compact, multipurpose Flygt pumps called the Ready range, which is offered as part of its on-site service.

Marketing manager for Xylem's rental and dewatering services Stefan Swartling said the company had identified a growing need for turn-key solutions.

"We are noticing an increased demand within the construction industry for dewatering services to be supplied as a complete package including the pump and water treatment systems, engineering expertise and project management.

"The beauty of the service means that customers don't have to invest in auxiliary equipment purchases which are needed for just as long as the project requires. The capital expenditure required to purchase, maintain, service and store the equipment isn't an issue when customers choose the on site dewatering package," said Mr Swartling.  

The Ready range is designed for use in small- and medium-sized applications, removing water, abrasive and corrosive liquids, contaminated water and water containing sand and gravel.
Ready pumps handle flows up to 7 l per second, heads to 14 m, and solids up to 38 mm in diameter. Power ratings range from 0.5 kW to 0.82 kW.

Xylem's Ready pumps product manager Pete Hansen claimed the new range is unique in terms of serviceability.

"They feature a removable top that allows quick access for cable changes and component replacements. By servicing the replaceable components, instead of throwing the pump away and buying a new one, users can reduce environmental impact as well as lower total cost of ownership. In addition, the pumps are exceptionally durable, intended for a long life of repeated use," Mr Hansen explained.

Another change in the pumps sector came in July when Swedish manufacturer Sulzer acquired Cardo Flow Solutions, including the ABS, Scanpump and Pumpex brands.

And Pumpex has expanded its product portfolio with a new high head dewatering pump, the P3001 SH. Powered by a 9.4 kW motor, it delivers over 80 m of head but weighs just 67 kg. The P3001 SH was designed for tough applications on construction sites, mines and tunnelling projects where easy handling, safety and reliability are crucial.

Like the rest of the pumps in the Pumpex dewatering range - which covers the 0.48 kW to 56 kW motor sizes - a key feature in the new P3001 SH is its modular design, providing easy service and maintenance access.