2011年8月22日星期一

CCR comes to the Pilbara

Their rapid growth has seen the need to accommodate the Pilbara region with a better supply of goods and services.

CCRs’ motto is “No hose is too big or small!”

Whether it be the local mechanic requiring a power steering hose, to the Blast Hole Drill within the mining sector, you can rely on CCR to provide quality support and experience with minimal downtime.

They guarantee every hose assembly that is supplied and fitted is of the highest quality and suits its application.

CCR take great confidence in supplying Gates OEM hose and fittings.

Gates are one of the worlds’ largest hydraulic hose and fitting manufacturers who are renowned for their high quality products.

CCR Hose and Fittings was founded in 2003 by Chris Harper, servicing the local businesses throughout the Perth metropolitan area then, onto blast hole drills for Reedrill where he was responsible for machine complete re-hoses to Pilbara Iron specifications.

With mining safety heavily scrutinized Chris saw the need to provide the service of maintaining mining equipment hosing on site, recording the upkeep/changes, replacing hoses when required and keeping the customer up to date with the future maintenance requirements with minimal downtime.

CCR’ main focus is making the locals, their valued customers, comfortable in knowing that your hydraulic hoses and fittings will be maintained by their quality hydraulic technicians with the utmost professionalism, guaranteed.

Their reputation is supported by their prospectus of customers.

They make every effort to ensure that their customers are given the utmost support, correct and accurate information, together with the guarantee of their quality knowledge and work.

And their mobile service provides a prompt response, anywhere within the Perth or Pilbara region.

CCR provide and deliver on-site training and certification for MDG 41 standards in Hose Management.

Ensuring only competent personnel can safely implement a systematic inspection, maintenance and hose replacement schedules.

This standard is poised to be incorporated into the National Mine Safety Act.

The CCR Safe Hydraulics Course, providing Gates Assembly Manufacturer Certification, will make the transition to compulsory accreditation effortless.

At CCR, they are committed to Community involvement through regular support of charities and local sport associations and clubs.

Representatives and mobile units located at the following mine sites:

Tom Price, Marandoo, Brockman 2, Brockman 4 and now with their new service centre opening at Paraburdoo providing CCR further coverage within the Pilbara region.